From a self-made scaffold erected on the waterside, we are scheduled to begin with the production of 28 pcs. micropiles, type TITAN 103/51, each ca. 30 m long, in order to tie-back a sheet piling that is going to be integrated in a new flood protection wall. In addition, our contract includes the measuring of our bore holes in the course of drilling works.



