Headquarter Building Unilever in Hamburg

Project Owner: Unileverhaus Projekt GmbH
Client: Franki Grundbau GmbH

Micropiling works for a combined deep foundation of the headquarter building Unilever. In total, we produced 79 Gewi-micropiles with double corrosion protection designed to absorb both vertical and horizontal loads.

Additional Info

Client: Unileverhaus Projekt GmbH
Project Owner: Franki Grundbau GmbH
System: Gewi-micropile with double corrosion protection / steel diameter 50 mm
Amount: 79 pcs.
Length: 18 m
Service Load: up to 510 kN
Test Load: not reported
Technique: single head flush drilling
Building Ground: Sand
Time Span of Works: August – November 2007
Building Objective: Deep+Foundation
Geotechnical System: GEWI
Geotechnical Craft: Piling+Works
Building Industry: Commercial & Industrial Building
Region: GermanyNorth

Leave a comment

Bitte geben Sie die Felder mit (*) auf jeden Fall ein. Basis HTML Code ist gestattet.