Micropiling works for a combined deep foundation of the headquarter building Unilever. In total, we produced 79 Gewi-micropiles with double corrosion protection designed to absorb both vertical and horizontal loads.
Headquarter Building Unilever in Hamburg
Project Owner: Unileverhaus Projekt GmbHClient: Franki Grundbau GmbH
Additional Info
| Client: | Unileverhaus Projekt GmbH |
| Project Owner: | Franki Grundbau GmbH |
| System: | Gewi-micropile with double corrosion protection / steel diameter 50 mm |
| Amount: | 79 pcs. |
| Length: | 18 m |
| Service Load: | up to 510 kN |
| Test Load: | not reported |
| Technique: | single head flush drilling |
| Building Ground: | Sand |
| Time Span of Works: | August – November 2007 |
| Building Objective: | Deep+Foundation |
| Geotechnical System: | GEWI |
| Geotechnical Craft: | Piling+Works |
| Building Industry: | Commercial & Industrial Building |
| Region: | GermanyNorth |
Leave a comment
Bitte geben Sie die Felder mit (*) auf jeden Fall ein. Basis HTML Code ist gestattet.


